CHERRY AVE over I - 22

CHERRY AVE OVER I-22 · County 073, Alabama · Built 2002 · 3 Lanes · 1,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017879
Year Built
2002
Length
121.9 m (399.9 ft)
Max Span
38.1 m
Width
17.3 m (56.8 ft)
Lanes
3
Daily Traffic
1,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,007,000
Total Project Cost
$5,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.