US 80 WBL * EBL over CANEY CREEK

.9 MI. E OF DANNLEY FIELD · County 101, Alabama · Built 2003 · 4 Lanes · 25,080 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
017757
Year Built
2003
Length
23.4 m (76.8 ft)
Max Span
3.7 m
Width
12.1 m (39.7 ft)
Lanes
4
Daily Traffic
25,080
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,757,000
Total Project Cost
$3,033,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.