AL 61 over DRY CREEK RELIEF

3.5 MI N PERRY CO LINE · County 065, Alabama · Built 2002 · 2 Lanes · 1,270 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
017736
Year Built
2002
Length
17.6 m (57.7 ft)
Max Span
4.3 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
1,270
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$597,000
Total Project Cost
$657,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.