AL 61 over WHITSITT CREEK

4.5 MI S GREENSBORO · County 065, Alabama · Built 2002 · 2 Lanes · 2,070 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
017672
Year Built
2002
Length
21.6 m (70.9 ft)
Max Span
5.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,070
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,042,000
Total Project Cost
$1,146,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.