AL 77 over TALLADEGA CREEK

WALDO · County 121, Alabama · Built 2003 · 2 Lanes · 3,177 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
017639
Year Built
2003
Length
73.2 m (240.2 ft)
Max Span
30.5 m
Width
14.2 m (46.6 ft)
Lanes
2
Daily Traffic
3,177
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,631,000
Total Project Cost
$2,894,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.