LAKESHORE PKWY over ZURICH ROAD

LAKESHORE OVER ZURICH DR · County 073, Alabama · Built 2001 · 3 Lanes · 5,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017599
Year Built
2001
Length
32.3 m (106 ft)
Max Span
29.8 m
Width
16 m (52.5 ft)
Lanes
3
Daily Traffic
5,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,462,000
Total Project Cost
$1,608,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.