SO.FRONTAGE RD. over BEAN RIVER

400WEST HENSLEY RD · County 127, Alabama · Built 2000 · 2 Lanes · 100 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
017499
Year Built
2000
Length
6.3 m (20.7 ft)
Max Span
3 m
Width
84.6 m (277.6 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$735,000
Total Project Cost
$809,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.