US 72; AL 2 over I565

I565 * U.S. 72 · County 089, Alabama · Built 2004 · 2 Lanes · 4,446 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017451
Year Built
2004
Length
141.1 m (462.9 ft)
Max Span
36.9 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
4,446
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,782,000
Total Project Cost
$4,160,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.