AL-233 over I-22

34.5 MP on I-22/AL-233 · County 093, Alabama · Built 2000 · 2 Lanes · 700 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

33.966597, -87.705639

This bridge is in worse condition than 71.8% of bridges in County 093. The average bridge in Alabama is 0 years old; this one is 26 years old.

Nearby Bridges

Bridge Details

Structure #
017219
Year Built
2000
Length
114 m (374 ft)
Max Span
35 m
Width
18.3 m (60 ft)
Lanes
2
Daily Traffic
700
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,050,000
Total Project Cost
$5,555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.