AL 108 RAMP #4 over AL 126

Intersects AL108/AL126 · County 101, Alabama · Built 2014 · 2 Lanes · 5,120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
017143
Year Built
2014
Length
92 m (301.8 ft)
Max Span
36 m
Width
12.8 m (42 ft)
Lanes
2
Daily Traffic
5,120
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,927,000
Total Project Cost
$3,220,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.