ANDREWS RD(EXIT66) over I-85

2.6MI N INTER US29 * I85 · County 081, Alabama · Built 2002 · 3 Lanes · 3,360 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
017074
Year Built
2002
Length
94 m (308.4 ft)
Max Span
32 m
Width
16.7 m (54.8 ft)
Lanes
3
Daily Traffic
3,360
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,834,000
Total Project Cost
$4,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.