I-22 over AL-69

M.P. 61 on I-22 · County 127, Alabama · Built 1996 · 2 Lanes · 18,526 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

33.819397, -87.313181

This bridge is in worse condition than 47.6% of bridges in County 127. The average bridge in Alabama is 0 years old; this one is 30 years old.

Nearby Bridges

Bridge Details

Structure #
017037
Year Built
1996
Length
79.2 m (259.8 ft)
Max Span
33.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
18,526
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,632,000
Total Project Cost
$2,895,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.