CO RD 20 over TRIB ESCATAWPA RIVER

0.9MI W US 45 · County 129, Alabama · Built 1959 · 2 Lanes · 200 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
016997
Year Built
1959
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
200
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$287,000
Total Project Cost
$316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.