SNOWVILLE-BRENT RD over BLACK WARRIOR R TRIBUTAR

2 MI SW US 78 · County 073, Alabama · Built 1995 · 2 Lanes · 2,051 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
016914
Year Built
1995
Length
6.7 m (22 ft)
Max Span
3 m
Width
13.3 m (43.6 ft)
Lanes
2
Daily Traffic
2,051
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$308,000
Total Project Cost
$339,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.