CR47 MAPLE SPRG RD over CHESTNUT CREEK

CR47 1MI NE MAPLE SPRINGS · County 021, Alabama · Built 1966 · 2 Lanes · 400 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016854
Year Built
1966
Reconstructed
1996
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$733,000
Total Project Cost
$806,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.