DAY ST over CSX RR

0.87 MI W OF I-65 · County 101, Alabama · Built 1996 · 4 Lanes · 27,167 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
016848
Year Built
1996
Length
79.6 m (261.2 ft)
Max Span
24.4 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
27,167
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$4,121,000
Total Project Cost
$4,533,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.