CR75 WILLIE HAMILT over POLEY CREEK

CR75 1.2 M N HIGHLAND CH · County 021, Alabama · Built 1979 · 2 Lanes · 100 vehicles/day

Overall
Good
Culvert
8
Very Good

Bridge Details

Structure #
016508
Year Built
1979
Reconstructed
1993
Length
13.4 m (44 ft)
Max Span
4.3 m
Width
6.7 m (22 ft)
Lanes
2
Daily Traffic
100
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$512,000
Total Project Cost
$563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.