NEW PARRISH HWY over SOUTHERN RAILWAY

PARRISH · County 127, Alabama · Built 1985 · 2 Lanes · 2,900 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
016480
Year Built
1985
Length
47.9 m (157.2 ft)
Max Span
16.5 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
2,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,193,000
Total Project Cost
$1,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.