CO. RD. 49 over WEEKS BRANCH
2.7 MI. S. OF U. S. 98 · County 003, Alabama · Built 1995 · 2 Lanes · 1,157 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
30.369006, -87.767669
This bridge is in worse condition than 65.2% of bridges in County 003. The average bridge in Alabama is 0 years old; this one is 31 years old.
Nearby Bridges
SHERMAN ROAD over WEEKS BRANCH
Built 1954
Norris Lane over Trib to Skunk Bayou
Built 2022
CO. RD. 26 over WEEKS CREEK
Built 2003
COUNTY ROAD 26 over NOLTE CREEK
Built 2004
Mag. Springs Hwy. over MAGNOLIA RIVER
Built 1996
COUNTY ROAD 16 over SKUNK BAYOU
Built 2003
US 98 over SCHOOL HOUSE CREEK
Built 1987
US 98 over SPRING BRANCH
Built 1929
US 98 over BRANCH TO ESLAVA
Built 1929
US 98 over ESLAVA BRANCH
Built 1988
Bridge Details
- Structure #
- 016194
- Year Built
- 1995
- Length
- 20.7 m (67.9 ft)
- Max Span
- 10.4 m
- Width
- 10.2 m (33.5 ft)
- Lanes
- 2
- Daily Traffic
- 1,157
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $642,000
- Total Project Cost
- $706,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.