SR 134 MP 38.078 over DILLY BRANCH

3.6 MI.E.OF DALEVILLE · County 045, Alabama · Built 1994 · 2 Lanes · 4,460 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
016111
Year Built
1994
Length
37.5 m (123 ft)
Max Span
12.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,460
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,380,000
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.