AL-6 over Branch

8.34 MI E Miss State Line · County 107, Alabama · Built 1989 · 2 Lanes · 4,752 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
015996
Year Built
1989
Reconstructed
1993
Length
8.8 m (28.9 ft)
Max Span
4.3 m
Lanes
2
Daily Traffic
4,752
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,603,000
Total Project Cost
$3,963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.