SR 163 over DOG RIVER

5.8 MI S I-10 · County 097, Alabama · Built 1995 · 4 Lanes · 7,847 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
015977
Year Built
1995
Length
1123.2 m (3685 ft)
Max Span
54.9 m
Width
22.9 m (75.1 ft)
Lanes
4
Daily Traffic
7,847
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$57,762,000
Total Project Cost
$63,538,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.