R16W (I565-PRATT) over CONNECTS TO RAMP 8

2.7 MI E JCT I565 * SR 53 · County 089, Alabama · Built 1991 · 1 Lanes · 962 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015956
Year Built
1991
Length
83.5 m (274 ft)
Max Span
27.7 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
962
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,730,000
Total Project Cost
$1,903,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.