R6 (I565E-US231N) over R-7; US 231; PINHOOK CR

RAMP 6 OVER MEM.PKWY · County 089, Alabama · Built 1991 · 1 Lanes · 7,715 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015938
Year Built
1991
Length
1441 m (4727.7 ft)
Max Span
54.9 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
7,715
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$26,678,000
Total Project Cost
$29,346,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.