CO RD 128 over COBBS BRANCH

1.6 MI E MT HEBRON · County 063, Alabama · Built 1993 · 2 Lanes · 210 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
015865
Year Built
1993
Length
21.9 m (71.9 ft)
Max Span
7.3 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
210
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$534,000
Total Project Cost
$587,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.