US-84 MP 187.378 over CLAYBANK CREEK

1 MI.W. JCT. SR-85 · County 045, Alabama · Built 1993 · 2 Lanes · 9,465 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015772
Year Built
1993
Length
218.8 m (717.8 ft)
Max Span
36.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
9,465
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,303,000
Total Project Cost
$6,933,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.