TRIANA BLVD. over I-565/ NFS R.R.

1.3 MI E JCT I565 * SR 53 · County 089, Alabama · Built 1989 · 4 Lanes · 7,565 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015769
Year Built
1989
Length
173.1 m (567.9 ft)
Max Span
31.7 m
Width
19.7 m (64.6 ft)
Lanes
4
Daily Traffic
7,565
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,908,000
Total Project Cost
$8,699,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.