I-565 over N.S. R.R./INTERGRAPH WAY

2.8 MI E CO LINE ROAD · County 089, Alabama · Built 1988 · 3 Lanes · 36,415 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015742
Year Built
1988
Length
94.2 m (309.1 ft)
Max Span
36.9 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
36,415
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,126,000
Total Project Cost
$4,539,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.