AL-14 over Warrior River Relief

0.5 MI W Warrior River · County 063, Alabama · Built 1992 · 2 Lanes · 1,875 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015734
Year Built
1992
Length
125 m (410.1 ft)
Max Span
12.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,875
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,932,000
Total Project Cost
$4,325,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.