PEPPER ROAD over FRENCH MILL CR

SEC9 T3S R3W · County 083, Alabama · Built 1993 · 2 Lanes · 890 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
015730
Year Built
1993
Length
9.8 m (32.2 ft)
Max Span
3 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
890
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$353,000
Total Project Cost
$388,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.