4TH ST SE over CSX RR

0.1 MI E JCT US31 * US278 · County 043, Alabama · Built 1993 · 3 Lanes · 10,970 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015716
Year Built
1993
Length
31.4 m (103 ft)
Max Span
13.1 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
10,970
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,781,000
Total Project Cost
$1,959,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.