SPRAGUE JCT. ROAD over DRAINAGE RELIEF
.8 MI E US 331 · County 101, Alabama · Built 1992 · 2 Lanes · 98 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
32.130042, -86.265122
This bridge is in worse condition than 34% of bridges in County 101. The average bridge in Alabama is 0 years old; this one is 34 years old.
Nearby Bridges
SPRAGUE JCT. ROAD over DRAINAGE RELIEF
Built 1991
SPRAGUE JCT. RD. over RAMER CREEK
Built 1977
MORSE ROAD over MORSE SLOUGH
Built 1991
E.OLDHAYNEVILLE RD over RAMER CREEK
Built 1969
OLD SELLERS RD. over BRANCH
Built 1990
E.OLDHAYNEVILLE RD over DRAINAGE RELIEF
Built 1969
OLD SELLERS RD. over DRAINAGE RELIEF
Built 1990
UNIONACDMY-ADA RD. over PINTLALA CRK.RELIEF
Built 1973
BUTLER MILL ROAD over DRAINAGE DITCH
Built 1991
UNIONACDMY-ADA RD. over CREEK
Built 1987
Bridge Details
- Structure #
- 015559
- Year Built
- 1992
- Length
- 41.5 m (136.2 ft)
- Max Span
- 10.4 m
- Width
- 9.4 m (30.8 ft)
- Lanes
- 2
- Daily Traffic
- 98
- Material
- Concrete
- Design
- Channel Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,053,000
- Total Project Cost
- $1,158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.