SR 25 over DRY CREEK REL.

1.3 MI. S. OF VINELAND · County 091, Alabama · Built 1991 · 2 Lanes · 1,340 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
015441
Year Built
1991
Length
37.5 m (123 ft)
Max Span
12.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,340
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,380,000
Total Project Cost
$1,518,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.