CO 27 over MARINGO CREEK

2.2 MI S E HUGLEY · County 113, Alabama · Built 1931 · 2 Lanes · 170 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

32.418492, -85.211831

This bridge is in worse condition than 53.2% of bridges in County 113. The average bridge in Alabama is 0 years old; this one is 95 years old.

Nearby Bridges

Bridge Details

Structure #
015273
Year Built
1931
Reconstructed
1991
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
170
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$948,000
Total Project Cost
$1,043,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.