EDGAR WOODS RD over EAST CHOCTAWHATCHEECREEK

1.4 MI SW OF CO 79 · County 005, Alabama · Built 1990 · 2 Lanes · 130 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
015177
Year Built
1990
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
130
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$507,000
Total Project Cost
$558,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.