MISSION ROAD over PASTURE CREEK

0.2 MI FROM END MISSION · County 097, Alabama · Built 1990 · 2 Lanes · 110 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
015095
Year Built
1990
Length
21.9 m (71.9 ft)
Max Span
7.3 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
110
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$574,000
Total Project Cost
$631,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.