SR 114 over TUCKABUM CREEK

2.7 MI. N. OF LAVACA · County 023, Alabama · Built 1989 · 2 Lanes · 2,410 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

32.170664, -88.061736

This bridge is in worse condition than 47.4% of bridges in County 023. The average bridge in Alabama is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
014941
Year Built
1989
Length
130.8 m (429.1 ft)
Max Span
18.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,410
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,098,000
Total Project Cost
$4,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.