CR. 62 over PIGEON CREEK(MC)

1.0 MI.SW UNION CHURCH · County 013, Alabama · Built 1989 · 2 Lanes · 382 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014915
Year Built
1989
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
382
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,106,000
Total Project Cost
$1,217,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.