SR 41 over LIMESTONE CREEK

2.1 MI. N. OF MONROEVILLE · County 099, Alabama · Built 1989 · 2 Lanes · 910 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 7 Good
Substructure 7 Good

Location

31.562328, -87.350453

This bridge is in worse condition than 52.1% of bridges in County 099. The average bridge in Alabama is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
014893
Year Built
1989
Length
221.3 m (726 ft)
Max Span
21.3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
910
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,221,000
Total Project Cost
$6,843,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.