US 82 over BIG MULBERRY CRK RELIEF

0.8 MI E OF SR 22 · County 021, Alabama · Built 1989 · 2 Lanes · 3,330 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
014835
Year Built
1989
Length
148.7 m (487.9 ft)
Max Span
12.5 m
Width
14.3 m (46.9 ft)
Lanes
2
Daily Traffic
3,330
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,937,000
Total Project Cost
$5,431,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.