RAMP 45 TO SR 20 over RAMP43 INTO AIRPORT RD

.3 M W JCT I565*AIRPRT RD · County 089, Alabama · Built 1989 · 1 Lanes · 2,310 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014778
Year Built
1989
Length
73.8 m (242.1 ft)
Max Span
30.5 m
Width
8.5 m (27.9 ft)
Lanes
1
Daily Traffic
2,310
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,556,000
Total Project Cost
$1,712,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.