CR 129 C.JAMES RD. over BOUGE CHITTO CREEK

.5M.WEST.AL14.GRAVL .ROAD · County 105, Alabama · Built 1970 · 1 Lanes · 115 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
014769
Year Built
1970
Reconstructed
1989
Length
8.2 m (26.9 ft)
Max Span
8.2 m
Width
6.6 m (21.7 ft)
Lanes
1
Daily Traffic
115
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$213,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.