CO RT 606 over DOUBLE BRIDGES CREEK

4.3 MILESSOUTHWESTOFENTER · County 031, Alabama · Built 1989 · 2 Lanes · 1,115 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014715
Year Built
1989
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
11.3 m (37.1 ft)
Lanes
2
Daily Traffic
1,115
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,298,000
Total Project Cost
$1,428,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.