CR-49 over Unnamed Branch

0.6 MI. S. MT. OLIVE · County 037, Alabama · Built 1946 · 2 Lanes · 1,201 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
014701
Year Built
1946
Reconstructed
1989
Length
6.6 m (21.7 ft)
Max Span
3.3 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
1,201
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$264,000
Total Project Cost
$290,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.