SR 10 over RELIEF

9.9 MI. E. OF BUTLER · County 023, Alabama · Built 1989 · 2 Lanes · 2,220 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

32.094181, -87.877342

This bridge is in worse condition than 61.7% of bridges in County 023. The average bridge in Alabama is 0 years old; this one is 37 years old.

Nearby Bridges

Bridge Details

Structure #
014680
Year Built
1989
Length
62.5 m (205.1 ft)
Max Span
12.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
2,220
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,150,000
Total Project Cost
$2,365,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.