SR 59 over WILLIE LEE CREEK

3.8 MI S MONROE CO LINE · County 003, Alabama · Built 1988 · 2 Lanes · 839 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
014601
Year Built
1988
Length
23.2 m (76.1 ft)
Max Span
11.6 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
839
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$648,000
Total Project Cost
$713,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.