CO RT 8 over MIDDLE CYPRESS CREEK

0.8 MI E INT AL 157 · County 077, Alabama · Built 1988 · 2 Lanes · 330 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
014512
Year Built
1988
Length
21.9 m (71.9 ft)
Max Span
7.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
330
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$513,000
Total Project Cost
$564,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.