I-565 over ZIERDT ROAD

I-565 OVER ZIERDT RD. · County 089, Alabama · Built 1988 · 3 Lanes · 35,103 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014453
Year Built
1988
Length
76.2 m (250 ft)
Max Span
34.1 m
Width
17.9 m (58.7 ft)
Lanes
3
Daily Traffic
35,103
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,436,000
Total Project Cost
$3,780,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.