MEDICAL PARK DR over PINE BARREN WATERSHED

600 S PINEHILL DRIVE · County 053, Alabama · Built 1988 · 2 Lanes · 532 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
014362
Year Built
1988
Length
7.3 m (24 ft)
Max Span
3.7 m
Lanes
2
Daily Traffic
532
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$334,000
Total Project Cost
$367,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.