CELESTE RD over BAYOU SARA CREEK

1.1 MI N W I65 · County 097, Alabama · Built 1943 · 2 Lanes · 12,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
014337
Year Built
1943
Reconstructed
1988
Length
52.4 m (171.9 ft)
Max Span
10.4 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
12,000
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,847,000
Total Project Cost
$2,032,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.